Shower body finish trim

Removed three valve shower body and replaced
with thermostatic pressure balance rough valve,
diverter, and volume control valves.
Removed three valve shower body and replaced
with thermostatic pressure balance rough valve,
diverter, and volume control valves.
Posted by Felix at 10:53 AM
Labels: Plumbing, Shower body, Tiling
New York |
1 comments:
Hola Felix,
I remember how delight the contractor was when he saw the difference in the bathroom. TFS, Mima
Post a Comment