Shower body finish trim

Removed three valve shower body and replaced
with thermostatic pressure balance rough valve,
diverter, and volume control valves.
Removed three valve shower body and replaced
with thermostatic pressure balance rough valve,
diverter, and volume control valves.
Posted by Felix at 10:53 AM 1 comments
Labels: Plumbing, Shower body, Tiling
Posted by Felix at 9:03 AM 1 comments
New York |